Misdirection is spot on in all respects. It is also a good practice to allow for a cool down period prior to securing the genset. Mainly if it has been run hard for a while (heavy load). In these cases take the load off the generator for a few minutes and then shut it down.
The following 1 user Likes jclark003's post:1 user Likes jclark003's post Donaldjames (09-09-2020)